Reply from Prakash_Shrestha on Dec 31 at 11:32 AM The situation is Standard cost estimate in created in Plant A where BOM and Routing exist. Material is stock transfer to Plant B where there neither BOM nor Routing exists. But the Standard cost is to be transferred from plant A to plant B. Using OMD9 and CK11N, I can transfer standard cost of one material from Plant A to Plant B. But I am not able to transfer standard cost of multiple materials at once. I need to know, how it can be done. Is is possible? If yes, how. Please advice and throw the steps. Thanks
| | | ---------------Original Message--------------- From: Sridhar Shrinivasan Sent: Friday, December 30, 2011 9:39 AM Subject: Transfer Standard Cost of Multiple Materials from Plant Use CK40N with suitable transfer control to cost the materials. Sridhar | | Reply to this email to post your response. __.____._ | _.____.__ |