Question from hhausr on Apr 16 at 2:09 AM Which JOB synchronized the SLD with LMBD? I work with SolMan 7.1 (ST 710 0004) and a have to add a SAP-System (SAP NetWeaver 2004s, double stack). The entries in the SLD are correct, daily updated. But when i look in LMBD (Technical system Editor --> Software) no "Productive Instances" are visible. When i try to add such "productive instanzes" using the button "Add" i find no "Technical Systems" pushing "Poroposals fittings to SCs". If i try to "Resync from SLD" (push this button in LMBD), i get this message: "Resync of Technical System not possible due to missing Data Supplier". In sm37 i see, that this JOBS runs: SAP_LMDB_LDB_0000000001 Job started Step 001 started (program AI_LMDB_R_SYNC_RUNNER, variant LDB_0000000001, user ID SOLMAN_BTC) Content sync started with extended SID generation on Incremental Sync: Number of changes to be synced from destination LMDB_SyncDest1: 0 Destination LMDB_SyncDest1 points to http://s96tlb08.edc.corpintra.net:8010/sld/cimom (sld/active Content Sync finished successfully. Job finished Looks fine. But is this the correct JOB for synchronizing SLD and LMBD? What went wrong if i push the button "Resync from SLD" in transaction LMBD? Best regards from Rutesheim, Helmut | Reply to this email to post your response. __.____._ | | hhausr SAP Administrator / Berater | | _.____.__ |
No comments:
Post a Comment